This was a turn key project entirely implemented by Lights Up Professional in Kishinev, the Republic of Moldova.
Publika TV requested the set-up of an open Newsroom studio, with a surfaceof over 350 square meters.
As the building frame could not support the weight of the lighting grate, we used a self-supporting structure of duralumin kits. Four beams of the HD 40x60cm kit constituted the key element in insuring the required carrying...
This was a turn key project entirely implemented by Lights Up Professional in Kishinev, the Republic of Moldova.
Publika TV requested the set-up of an open Newsroom studio, with a surfaceof over 350 square meters.
As the building frame could not support the weight of the lighting grate, we used a self-supporting structure of duralumin kits. Four beams of the HD 40x60cm kit constituted the key element in insuring the required carrying capacity for a free opening of 16 m between the lateral pillars.
With the support provided by this structure, it was possible to install a system of fixed and floating H60 rails in order to assemble the lighting equipment in any area of the studio. The flexibility of the IFF Top Suspension system proved crucial to the rapid implementation of different lighting schemes using a small number of lighting equipments.
The suspended part was completed by pantographs and telescopic arms.
A 96 dimmer track lighting control system completed the infrastructure required for the lighting equipment.
For the lighting, we used a combo of 4x55W Balcar fluorescent floodlights, 650W and 1000W Fresnel light projectors from Ianiro and ETC Source Four spotlight profiles.
Lighting System
TV STUDIO
Project for Studio 1, Teleradio in Kishinev, the Republic of Moldova, which involved:
- The dismantling of the old lighting system;
- The design, delivery, assembly and bringing into service of the new lighting system.
Technical specifications:
- Motor suspension system with ACTA 20 Wall Mount hoists;
- 104 dimmer tracks;
- ETC...
Lighting System
TV STUDIO
Project for Studio 1, Teleradio in Kishinev, the Republic of Moldova, which involved:
- The dismantling of the old lighting system;
- The design, delivery, assembly and bringing into service of the new lighting system.
Technical specifications:
- Motor suspension system with ACTA 20 Wall Mount hoists;
- 104 dimmer tracks;
- ETC control panel;
- Lighting equipment by Ianiro and Quartzcolor;
- Alutek truss;
- IFF pantographs.
General Media Group Chisinau is our largest project in the Republic of Moldova, and one of the most important, integrated and coherent projects of its type in Eastern Europe.
Built from scratch, based on a project by Janson Tsai Design, the Global Media Center has 3 TV production studios, covering 1,000, 600 and 300 square meters, respectively.
Lights Up Professional ensured consultancy for the design of the lighting systems and was...
General Media Group Chisinau is our largest project in the Republic of Moldova, and one of the most important, integrated and coherent projects of its type in Eastern Europe.
Built from scratch, based on a project by Janson Tsai Design, the Global Media Center has 3 TV production studios, covering 1,000, 600 and 300 square meters, respectively.
Lights Up Professional ensured consultancy for the design of the lighting systems and was in charge of equipment delivery, assembly and bringing into service.
MEGAVISION TV, one of the most popular television stations in Chile, built four new production studios, with a total surface of over 2,750 square meters.
For the lighting scheme, we have chosen and designed a monitored suspended lighting solution, using Acta 30 hoists, each with a net load of 160 kg.
The 220 hoists required for the four studios, as well as the computerized control system, were delivered by Cosmolight – IFF...
MEGAVISION TV, one of the most popular television stations in Chile, built four new production studios, with a total surface of over 2,750 square meters.
For the lighting scheme, we have chosen and designed a monitored suspended lighting solution, using Acta 30 hoists, each with a net load of 160 kg.
The 220 hoists required for the four studios, as well as the computerized control system, were delivered by Cosmolight – IFF (Italy).
The assembly of these suspension systems was done by Technology Entertainment, a specialized company from Santiago de Chile.
Lights Up ensured training sessions for the assembly team and exploitation personnel and also coordinated and supervised the works.
The new production center of GENERAL VISION MEDIA GROUP from Kuwait City has 2 studios of 600 and 700 sqm.The suspension system for these 2 studios is composed by 102 pieces of IFF ACTA 30 hoists.
A DMX on CAT6 network that is flexible and configurable ensures the distribution of the lighting control signals.The equipments were delivered by LIGHTING SOLUTIONS LLC in Dubai. The project and the implementation of the DMX distribution, along with...
The new production center of GENERAL VISION MEDIA GROUP from Kuwait City has 2 studios of 600 and 700 sqm.The suspension system for these 2 studios is composed by 102 pieces of IFF ACTA 30 hoists.
A DMX on CAT6 network that is flexible and configurable ensures the distribution of the lighting control signals.The equipments were delivered by LIGHTING SOLUTIONS LLC in Dubai. The project and the implementation of the DMX distribution, along with the installation of the hoists were accomplished by LIGHTS UP PROFESSIONAL.
The Tandarica animation theater of Bucharest requested the building of a demountable performance space, with a capacity of 200 seats. The brief contained several requirements: a structure that could be set up in 3-4 days by a small team, without special equipment such as cranes, without wedge anchoring or supplementary ballast, a ventilated enclosure that would keep daylight out, stage mechanisms and a full audio and lighting system.
Lights...
The Tandarica animation theater of Bucharest requested the building of a demountable performance space, with a capacity of 200 seats. The brief contained several requirements: a structure that could be set up in 3-4 days by a small team, without special equipment such as cranes, without wedge anchoring or supplementary ballast, a ventilated enclosure that would keep daylight out, stage mechanisms and a full audio and lighting system.
Lights Up elaborated upon the theme and the project was implemented by de Alutek Italy with Ianiro Italy, in collaboration with Lights Up.
The main structure was built using Pilosio multidirectional system and allows several configurations: classic stage, Elizabethan stage or catwalk. The interior is completed by a multidirectional modular seating system with 192 seats.
The structure that sustains the walls, the roof and the electrical and lighting installations were built using 40Q duralumin kits - constructive heavy duty and standard – by Alutek Italy. The entire structure is covered with darkening PVC tarpaulin, keeping daylight out.
A fly system with 12 tackle-operated rods ensure the support for the stage lights and stage design elements required by the shows being performed in this space.
The York ventilation system was delivered and installed by Fresh Air – Romania.
Lights Up delivered the sound and lighting installation and supervised the entire process, ensuring the coordination between the various contractors, and also ensured the implementation and operation of the theatre.
MDI Targoviste, a regional television station that covers the South-Eastern part of Romania, inaugurated their new media center on November 12, 2014.
LIGHTS UP PROFESSIONAL designed the lighting system for the over 1,000 square meter studio.
MDI Targoviste, a regional television station that covers the South-Eastern part of Romania, inaugurated their new media center on November 12, 2014.
LIGHTS UP PROFESSIONAL designed the lighting system for the over 1,000 square meter studio.
For their daily show, produced in collaboration with the television station B1TV, Romanian newspaper “Evenimentul Zilei” (Events of the Day) organized an open studio within the station’s main newsroom. In order to create a suspension system for the lights that would also support the décor elements, Lights Up suggested and implemented a self-supporting structure of duralumin kits. Besides its functional role, this structure complements the aesthetic...
For their daily show, produced in collaboration with the television station B1TV, Romanian newspaper “Evenimentul Zilei” (Events of the Day) organized an open studio within the station’s main newsroom. In order to create a suspension system for the lights that would also support the décor elements, Lights Up suggested and implemented a self-supporting structure of duralumin kits. Besides its functional role, this structure complements the aesthetic line of the décor, becoming a part of it.
The S20Q construction elements were delivered by our partners at Alutek - Italia.
RTV asked for a solution for the lighting of several studios of the main newsroom that would ensure the possibility of rapidly modifying the positioning of the lighting equipment in order the lighting schemes required by various shooting spaces.
Lights up suggested and implemented a lighting solution based on the Top Suspension system by IFF Italy. A combo of fixed and mobile H80 tracks with the necessary accessories ensured the fulfillment...
RTV asked for a solution for the lighting of several studios of the main newsroom that would ensure the possibility of rapidly modifying the positioning of the lighting equipment in order the lighting schemes required by various shooting spaces.
Lights up suggested and implemented a lighting solution based on the Top Suspension system by IFF Italy. A combo of fixed and mobile H80 tracks with the necessary accessories ensured the fulfillment of RTV’s request.
Lights Up was involved in the implementation of lighting systems for the station’s studios, as well as for outdoor shooting. These projects were implemented in collaboration with Ianiro Italy, our old partners.
The highlight was the first virtual TV studio in Romania. To achieve the special lighting required for this type of studio, we had to design and implement a self-supporting structure for the suspension of the lights, as the studio...
Lights Up was involved in the implementation of lighting systems for the station’s studios, as well as for outdoor shooting. These projects were implemented in collaboration with Ianiro Italy, our old partners.
The highlight was the first virtual TV studio in Romania. To achieve the special lighting required for this type of studio, we had to design and implement a self-supporting structure for the suspension of the lights, as the studio ceiling frame could not support them.
The soft lighting required by this type of studio was done using 2x55W, 4x55W and6x55W fluorescent floodlights.